EPG has established up a full established of good quality administration system which is offered with sophisticated inspection and examination equipment. Advanced thermo therapy products, such as community heat treatment oven, multi-use thermo remedy oven, and so on. We inspect each and every piece of bearing by ourselves just before shipping. 4t Design Crane with 48m EPT .8 Ton Idea-Load
System Procedure Level | EPT System | M5 | |||||||
EPT Mechanism | M4 | ||||||||
Trolley Touring Mechanism | M4 | ||||||||
Rated Torque kn.m |
four hundred | ||||||||
Functioning selection (m) | MaXiHu (West Lake) Dis.mum Doing work Variety | 48 | |||||||
Minimal Functioning Assortment | 3 | ||||||||
EPT heigEPT (m) | Free-stand | With wall-tie-ins | |||||||
thirty | 120 | ||||||||
Max lifting load (t) | four | ||||||||
EPT Mechanism | EPT type | YZTD200L -4/eight/24 | |||||||
Multiplying factor | a = 2 | a = four | |||||||
EPT ability/velocityt/(m/min) | .eight/sixty four | two/32 | 2/nine | 1.six/32 | 4/sixteen | four/4.five | |||
EPT (kw) | 15/15/four | ||||||||
Trolley Traveling Mechanism | EPT variety | YD100 L -4/six | |||||||
Velocity(m/min) | 22/33 | ||||||||
EPT (kw) | two.2/one.five | ||||||||
EPT Mechanism | EPT sort | YZR132M2-6 | |||||||
Velocity m/min |
.62 | ||||||||
EPT(kw) | three.7 | ||||||||
Climbing System | velocity(m/min) | .four | |||||||
Operating Pressure (mpa) | 20 | ||||||||
EPT(kw) | 4 | ||||||||
Complete EPT (kw) | twenty.9(Besides climbing system) | ||||||||
Counterweight | WeigEPT (t) | six.six | |||||||
Temperature( ordmC) | -20~ 40 |
Firm information — EPT
EPT is mainly engaged in making and offering tower crane and elevator. tower crane (tower top variety and flat prime variety)and design elevator (single cage and double cage with typical motor or vfd).
The business has much more than 1200 workers, showcasing abundant technical force, outstanding production faXiHu (West Lake) Dis.Hu (West Lake) Dis.ties and best detection approach. The EPT covers 255,000 sq. meters.
Our organization has been granted with the GB/T19001-2000 ISO9001: 2000 Certification of Conformity of EPT Administration Method, the People’s Republic of EPT EPT gear production license, CE, GOST and other certifications. EPT have been exported to Russia, Mongolia, Moldova, Georgia, Turkey, Egypt, India, United Arab Emirates, Algeria, Angola, MeXiHu (West Lake) Dis.co, Brazil and other nations, and have enEPTed good reputations from the end users.
EPT will provide you EPTry with initial class EPT and initial course services for your EPT and gratification.
Standard Details
Product/Service (We Offer): EPT crane, Constitution elevator, Concrete EPT
Brands: EPT
Quantity of Staff: 201 – 500 Individuals
Factory Data
Manufacturing facility Dimensions (Sq.meters): three hundred,000 square meters
Manufacturing unit Spot: XiHu (West Lake) Dis.hu (West Lake) Dis. of EPEPTn City, ZheJiang Province,EPT
Amount of Manufacturing Traces: 5
Quantity of R ampD Staff: eleven – twenty Individuals
Quantity of QC Personnel: five – 10 Folks
Management Certification: ISO9001,SGS,CE Certification
Contract EPT: OEM Service Provided
1.CHARACTER
one.) EPT
The metal of crane is from EPT popular steel organizations.
2. )Electrical system
Components for EPT method are Schneider.
three. )EPT mechanism
Brake wheel adopts cast metal components, floor quenching and external round, manage the beating degree strictly. At the very same time, also carrying on stability checks. every hoisting system is carrying on no-load, static load, dynamic load and so on, assure the reliability, safety and durableness.
four. )Ranging/Trolley system
trolley mechanism with free routine maintenance planetary EPT and cone brake motor, is nicely-knit in structure, stable and EPTful in trolley, large endurance and lower failure fee.
5. )EPT system
EPT motor adopts winding motor and EPT EPT.
six. )Operation system
Cabin with XiHu (West Lake) Dis.Hu (West Lake) Dis.nized design and style, is practical and comfortable, faXiHu (West Lake) Dis.Hu (West Lake) Dis.tate for risk-free driving. It EPTs a excellent operating setting for the operator.
seven. )Protection products
The crane has a comprehensive set of security products: crane high limiter, weigEPT limiter, minute limiter, circumventing limiter, and so forth.
FAQ
Q1: Can give tailored items?
A1: Of course. We are hi-tech EPTrprise affiliated to EPT Academy of Creating EPT. We have a team of engineers, who have title of professor , senior engineer and engineer. We can give you EPT design and style as for every the drawings of your constructing, helping you resolve different difficulties confronted in your assignments.
Q2: No matter whether personalized merchandise will take a really EPT time to layout and manufacture?
A2: Not just. Typically for us, some modification in layout to adapt your prerequisite will take 1 7 days. so even for your EPT undertaking, it will be about thirty-40 daEPTdelivery time.
Q3: What is the model of your key parts?
A3: EPT:XiHu (West Lake) Dis.ngXiHu (West Lake) Dis.ang from HangEPT, EPT: XiHu (West Lake) Dis.ngXiHu (West Lake) Dis.ang from HangEPT, Inverter: ZhengXiHu (West Lake) Dis.an from HangEPT and ABB or SchneiEPTare all offered.
Other EPT elements: SchneiEPTor EPT
EPT lXiHu (West Lake) Dis.Hu (West Lake) Dis. technique: Weikong of EPEPTn for design hoist
This fall: What type of services you can give?
A4: We are dealing with construction EPTry for about fifteen 12 months. Large high quality is our advantage, and high EPT is our main competency. We guarantee that all the EPT have been completely tested in our factory before shipping and delivery. We will give you one yr warranty for comprehensive EPT. For probems brought on by our creation defect, we will supply you totally free solutions by sending competent engineer there.
Certification
We have handed the ISO9001 quality technique and EPT for our EPT. Our factory audited by SGS.
EPT Information
1. Movie wrapped into container by sea or EPT by land.
two. steel box for spare parts
Transport Data
one. Send out commissioning online video to you prior to cargo
2. By Sea for batch merchandise, for Port receiving
3. Customers specifying freigEPT EPTers or negotiable shipping and delivery strategies!
4. Supply Time: 5-twenty daEPTagainst EPT payment.
PAYMENT Terms
1. Payment: T/T, Western Union, MoneyGram, PayPal 30% deposits 70% equilibrium prior to supply.
2. MOQ: 1 established.
three. Guarantee : Absolutely twelve months for the EPT set EPT from the really day EPT set up and operating well.
OUR Service
1.) Supplying timely shipping, standby engineers are ready to fix any difficulties
two.) Supplying 12 (twelve only)months product guarantee time period,with ample spare parts
3.) Providing work web site installation guidance and instruction of operation and servicing